text.skipToContent text.skipToNavigation

PBR with Drip Stop

PBR with Drip Stop

Shop PBR metal roofing and siding panels with drip stop for commercial and industrial applications.
  • Colors may vary depending on browser setting. Final color selection should be made from metal color chips. Changing colors may require reselecting other product options and attributes.

The combinations selected are non-standard products and may exceed the price and standard lead time quoted herein. Our sales representative will contact you after the order is submitted online to confirm the final order pricing and assist you with a Sales Order Acknowledgement.

Registered users log in for your pricing.

Fetching price...
Quantity and Length

Quantity measures the number of items required to complete your project. Length is a measurement of the required item from end to end in feet and inches. Include material overages as needed.

Quantity Feet Inches Total Inches
or
Subtotal: $0.00

The subtotal includes the price of each individual item in your order. If there are any applicable taxes or discounts available they will be factored in after the subtotal is calculated.

Options Charges: $0.00
Total: $0.00
Packaging

All products are packaged and shipped in standardized packaging. The materials used in our standardized packaging may vary depending on the product. To learn more about the different packaging options we use, visit our FAQ page.


Product Description

PBR metal roofing with Drip Stop aids in interior moisture management for any building. Pockets within the Drip Stop felt membrane trap condensation, then releases it back into the air as normal humidity. During the manufacturing process, Drip Stop is applied to the back of the Stormproof panel, making it a seamless and efficient addition to any build. Not only does this product aid in moisture control, but it also helps to alleviate some of the cost of labor. By eliminating the need for fiberglass insulation, builders can expect to save an average of 25% in labor expenses. Additional benefits of the PBR metal panels with drip stop include its UL 723-approval for flame spread and smoke generation, and its 20-year adhesion warranty.

THE ADVANTAGE OF MBCI METAL Exposed Fastener Panel

Easy Installation

No Clips Needed
Pancake Head Fasteners

Exceptional Durability

Stronger Materials
Minimal Maintenance

60 - Year Life Span

Longer Lifespan Than Shingles
Less Placements

Save up to 40% in Energy Costs

Stabilize Home Temperature
Save Electricity

Back to top